ARTICLE AD BOX
![]()
Prime Minister Narendra Modi (R) and Russian President Vladimir Putin (PTI photo)
NEW DELHI: A cargo formation transported the archetypal batch of VVER-1000 substance assemblies from the Novosibirsk Chemical Concentrates Plant successful southwestern Siberia to India, Rosatom said successful a connection connected Thursday.A full of 7 flights from Russia are planned to proviso the full reactor halfway and immoderate reserve fuel. These shipments are provided nether a declaration signed successful 2024, which includes substance proviso for the 3rd and 4th VVER-1000 reactors of the Kudankulam works for the full work life, starting from archetypal loading.The Russian broadside said that since 2022, newer TVS-2M substance had been introduced astatine India’s 2 operational VVER-1000 plants Kudankulam unit-1 and unit-2, which led to “improved performance” and longer 18-month operating cycles.According to Rosatom, the Kudankulam unit-3 and unit-4 volition beryllium the archetypal VVER-1000 units to statesman cognition straight connected an 18-month cycle.At the Kudankulam plant, determination are 2 operational units and 4 much – units 3, 4, 5 and 6 – are nether construction. All six volition person VVER-1000 reactors with a full installed capableness of 6,000 MW.The archetypal 2 reactors astatine Kudankulam were connected to India's powerfulness grid successful 2013 and 2016. During the cognition of the archetypal 2 reactors, Russian and Indian engineers had done sizeable enactment to summation their ratio done the instauration of precocious atomic substance and extended substance cycles, Rosatom said.India has 21 reactor units successful commercialized cognition with a full capableness of astir 7.5 GW, providing conscionable astir 3.5% of the country’s energy generation. Five large-scale reactors are nether construction.
